FA-10140020: B F FLUE DUST - 4000 CU.M.; USED/REF REFRACTORY BRICKBATS OF FIRE CLAY BRICKS-200T; CINDER FROM SOAKING PITS - 800 CU.M.; USE/REF BROKEN RCC BLOCKS-206 T 0
1) ELECTRICAL GENERAL WORK FOR ADDITIONAL FREIGHT MAINTENANCE DEPOT AT COAL EMPTY YARD (P.P.YARD) WITH PROVISION OF THREE EXAMINATION LINES AND ONE SHUNTING NECK OF FULL LENGTH RAIPUR DIVISION IN SECR. 2) ELECTRICAL GENERAL WORK FOR DEVELOPMENT OF MAINTENANCE SHED FOR DEMU RAKE & BG DIESEL LOCOMOTIVES AT GONDIA, SECR IN _ DIVISION. 3) ELECTRICAL WORK FOR ELECTRONIC INTERLOCKING AT ITR STATION SECR IN _ DIVISION.
PROCUREMENT OF NOMINAL SIZE CAST IRON BRAKE BLOCK TO RDSO DRG. NO. D BG-1753, ALT-7 AND CONFIRMING TO RDSO SPEC NO.M C MTD 101 94 WITH CORRIGENDUM ADDENDUM SLIP NO.1 OF JAN 2001. QTY: 5000.00
PROCUREMENT OF OIL MACHINERY GENERAL PURPOSE MACHINERY OIL TO IS 493-81 PART-I, REAFFIRMED 2004 GR. VG-100. WITH RUST PREVENTIVE CHARACTERISTICS TEST, AS PER IS 1448-P-96, METHOD A . QTY: 98400.00
SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 20 MTRS. HIGH MAST LIGHTING SYSTEM WITH MOTORIZED ARRANGEMENT CONSIDERING WIND VELOCITY AS PER IS : 875 PART-3 WITH 8 NOS. OF 1 X 400W, 230V A/C LUMINARIES.
CONSTRUCTION OF 15 (FIFTEEN) NO. ISOLATION STOPPING BY BRICKS FOR STRAIGHTENING OF HAULAGE ROAD WAY AND SEALING OF THE DISTT. IN 10 B SEAM OF OF _ R.O. COLLIERY .
SUPPLY OF 960 CU.M. DRY AND SCREENED SAND AS PER SPECIFICATION TO DIESEL LOCO SHED, RAIPUR INCLUDING FILLING SAND IN LOCOMOTIVES AS AND WHEN REQUIRED AT FUELLING POINT OF DIESEL LOCO SHED, RAIPUR FOR A PERIOD OF 2 YEARS.
SUPPLY OF 960 CU.M. DRY AND SCREENED SAND AS PER SPECIFICATION TO DIESEL LOCO SHED, RAIPUR INCLUDING FILLING SAND IN LOCOMOTIVES AS AND WHEN REQUIRED AT FUELLING POINT OF DIESEL LOCO SHED, RAIPUR FOR A PERIOD OF 2 YEARS.
1. BSP: PROVISION OF 12 BAYS ADDITIONAL PLATFORM SHELTER (I) 04 BAY AT CPH, (II) 02 BAYS ON DN PF AT KHS, (III) 02 BAYS ON DN PF AT KGB, (IV) 02 BAYS AT BJRI & (V) 02 BAYS AT KTMA. 2. APR & BUH: CONSTRUCTION OF 03 UNIT TYPE-II QUARTERS ON REPLACEMENT ACCOUNT AT APR AND CONSTRUCTION OF 10 UNIT TYPE-II & 01 UNIT TYPE-III QUARTERS ON REPLACEMENT ACCOUNT AT BUH. 3. CONSTRUCTION OF RPF BARRACK AT OUT POST KTE FOR 10 STAFF. 4. BSP: CONSTRUCTION OF RPF REST ROOM AT BSP RAILWAY STATION FOR TRAIN ESCORTING STAFF
1. PROVISION OF CC PATHWAY AT STATION YARD AT KORBA. 2. AMARKANTAK: CONSTRUCTION OF REST HOUSE FOR GR. C STAFF AT AMARKANTAK.3. CONSTRUCTION OF STORE ROOM AT COACHING LOCO PIT _ FOR T
PROCUREMENT OF NG CARRIAGE WOOD BASE IMPREGNATED COMPREG LAMINATE WINDOW FRAME WITH TOUGHENED GLASS SHEET NGP S SK NO. 512 ALT-2 LATEST COMPREG. MATERIAL SPECIFICATION COMPREG TO RDSO SPECIFICATION C-9407 REV-2,OCT 04 , TYPE I.FIRE RETARDENCY CLOUSE APPENDIX G. MATERIAL AND SPECIFICATION AS PER DRG. QTY: 3060.00
SPARES FOR 20-90 DRAGLINE. HYDRAULIC JOINTS OF AUXILLARY CYLINDERS, PISTON RING, HYDRAULIC JOINTS OF HOIST CYLINDERS, SHOE HOLD CYLINDER, NON RETURN VALVE BLOCK, NON RETURN VALVE WITH THROTTLE, REVERSING SILDE VALVE, THREE POSITION OVERFLOW SLIDE VALVE, ELECTRO MAGNETIC SILDE VALVE INSTALLATION, LAMELLA FILTER, MAGNETIC FILTER
SPARES FOR 10-70 DRAGLINE AND 5-45 DRAGLINE . DISCHARGE CHAIN, DRAG CHAIN, WEDGE (DUMP THIMBLE), DUMP PULLEY ASSLY., UPPER HOISTING CHAIN, LOWER HOISTING CHAIN, BUSH(LOWER HOIST CHAIN), BUSH (DUMP THIMBLE), THIMBLE, DUMP (ROPE SIDE), BLOCK, WEDGE, SAFETY ROLLER ASSLY.
CONSISITING OF ITEM SL. NO. 20 TO 33 OF FIG.12 OF PARTBOOK, SAFETY ROLLER ASSLY CONSISTING OF ITEM SL. NO. 1 TO 6 OF FIG.12 OF PARTBOOK, SUPPORT, GASKET (PULLEY STR. SHOCKUP), GASKET (PULLEY STR. SHOCKUP)
SPARES FOR 20-90 DRAGLINE. HYDRAULIC JOINTS OF AUXILLARY CYLINDERS, PISTON RING, HYDRAULIC JOINTS OF HOIST CYLINDERS, SHOE HOLD CYLINDER, NON RETURN VALVE BLOCK, NON RETURN VALVE WITH THROTTLE, REVERSING SILDE VALVE, THREE POSITION OVERFLOW SLIDE VALVE, ELECTRO MAGNETIC SILDE VALVE INSTALLATION, LAMELLA FILTER, MAGNETIC FILTER
___: CONSTRUCTION OF NEW ___ BUILDING AT ___. (2) ___ DIVISION: CONSTRUCTION OF8 UNITS OF TYPE-II &5 UNITS OF TYPE-III STAFF QUARTERS FOR S & T STAFF OF ___ DIVISION (3) ___: TO DE-CONGEST PF-1, CONSTRUCTION OF LINEN ROOM IN COACHING DEPOT/___.
ELECTRICAL SPARES FOR 10-70 DRAGLINE AND 5-45 DRAGLINE. FAN WITH ELECT MOTOR A02- 32-4B,3KW / 220/380V, 1430RPM,2M3/SEC. CAPACITY COMPLETE ASSLY., MAGNETIC AMPLIFIER UNIT(VOLTAGE REGU), MAGNETIC AMPLIFIER UNIT(POWER), MAGNETIC AMPLIFIER, HIGH VOLTAGE OIL CIRCUIT BREAKER, RING CURRENT COLLECTOR, 6.6 KV, HALF RING, FAN NO.5 DRIVEN BY INDUCTION MOTOR A02- 51/13 KW/220-380 V/1450 RPM AIR CAPACITY 3M3/SEC. COMPLETE ASSLY., LIMIT SWITCH FOR DRAG & HOIST, FOUR-POSITIVE MASTER CONTROLLER FOR DRAG & HOIST, SWING MASTER CONTROLLER, LIMIT SWITCH, BLOWER ASSLY. WITH MOTOR,TYPE A-A112, M4T2,5.5KW,400V 11A,1445RPM,50HZ